Monochrome Injection Disposable Fork Cutlery Set Mold

Product name Injection Plastic Cutlery Set (fork ,spoon ,knife ,plate etc.)Product MaterialPP/PSMold structure Hot runner/Cold Runner with vavle gate system(Germany HOTSET heaters)Mold core/cavity material S136, NAK80 or as customer\' s requirementMold base material P20, 718, 2738, H13 or as customer\' s

Featured Products

Product name Injection Plastic Cutlery Set (fork ,spoon ,knife ,plate etc.)
Product MaterialPP/PS
Mold structure Hot runner/Cold Runner with vavle gate system(Germany HOTSET heaters)
Mold core/cavity material S136, NAK80 or as customer' s requirement
Mold base material P20, 718, 2738, H13 or as customer' s requirement
Design software PROE, Cimtron, UG, AutoCAD, CAM, CAE, UG, ect
Mould surface Texture/Mirror Polish or according to customer' s request
Delievery time 15-40days after get the deposit
Unicolor Injection Plastic Disposable Fork Cutlery Set Mold
Unicolor Injection Plastic Disposable Fork Cutlery Set Mold
Unicolor Injection Plastic Disposable Fork Cutlery Set Mold
Unicolor Injection Plastic Disposable Fork Cutlery Set Mold
Unicolor Injection Plastic Disposable Fork Cutlery Set Mold
Unicolor Injection Plastic Disposable Fork Cutlery Set Mold



MOULD  MANUFACTURE  PROCESS
1) Cap Mould : grinding→fly-cutter →CNC Milling→drilling→lathe→boring lathe→electric pulse →fine fly-cutter→polish→electroplate→install
 
2) Preform Mould: grinding→drilling→lathe→boring lathe→fine fly-cutter→electroplate→install


Business Steps
1. R& D    We support customers' R& D. We'll make the  files or improve the design if you need

2. Quotation Making  Mould Quotation will be finished in 1 day according to information we get.

3. Negotiation    The negotiation includes quality, price, material, delivery time, payment item, ect.

4. Mould Design   We need to spend 3-5 days on mould and product 3D/2D drawing design

5. Mould   We will build the mould based on customers' requirements. Before making the mould, we'll send mould design to get customers' approval first. Mould will be usually completed in 25-60 days

6. Mould Testing  When moulds are finished, we will test the moulds to check if they will satisfy consumers' needs. And we will send samples for consumers' reference.

7. Sample shoot   If the first sample come out is not satisfied by customers, we will modify the mould until it can meet customers' needs.

8. Delivery   We'll delivery goods either by sea or by air, according to customers' requirements.


FAQ
Q: what is your trade term?
A: normally FOBNINGBO, if customer country requires, also can accept L/C at sight.
Q: what is your payment term?
A: 30% down payment against order confirmation, 70% balance payment prior shipment.
Q: Have blow machine 100% assemnled well in stock?
A: NO.All blow machine will be assembly produced according to your order.
Q:what is your delivery time?
A: usually in 10-45days, depends on your projects.
Q: what about installing in customer factory?
A: after machine arrive your factory, please prepare water, electric,air and perform, then we will arrange engineer to install machine and train your workers, the longest time to free installing shall be in one week, you should afford engineer air tickets, food, hotel,transport.
Q: what is your packing?
A: wooden pallet packing.
Q:guarantee time?
A: one year guarantee, not man-made.



Showroom
Unicolor Injection Plastic Disposable Fork Cutlery Set Mold


Unicolor Injection Plastic Disposable Fork Cutlery Set Mold
Unicolor Injection Plastic Disposable Fork Cutlery Set Mold
Unicolor Injection Plastic Disposable Fork Cutlery Set Mold
Unicolor Injection Plastic Disposable Fork Cutlery Set Mold


IF YOU WANT TO KNOW MORE INFO ,PLEASE CONTACT ME.

York Kwok
Taizhou Jingtu Plastic Mould Co.,Ltd
M:
008613216900876
A:West Industry Zone,Huangyan Taizhou ,Zhejiang,China


 

 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours
73.js">