Product name | Injection Plastic Cutlery Set (fork ,spoon ,knife ,plate etc.) |
Product Material | PP/PS |
Mold structure | Hot runner/Cold Runner with vavle gate system(Germany HOTSET heaters) |
Mold core/cavity material | S136, NAK80 or as customer' s requirement |
Mold base material | P20, 718, 2738, H13 or as customer' s requirement |
Design software | PROE, Cimtron, UG, AutoCAD, CAM, CAE, UG, ect |
Mould surface | Texture/Mirror Polish or according to customer' s request |
Delievery time | 15-40days after get the deposit |
MOULD MANUFACTURE PROCESS
1) Cap Mould : grinding→fly-cutter →CNC Milling→drilling→lathe→boring lathe→electric pulse →fine fly-cutter→polish→electroplate→install
2) Preform Mould: grinding→drilling→lathe→boring lathe→fine fly-cutter→electroplate→install
Business Steps
1. R& D We support customers' R& D. We'll make the files or improve the design if you need
2. Quotation Making Mould Quotation will be finished in 1 day according to information we get.
3. Negotiation The negotiation includes quality, price, material, delivery time, payment item, ect.
4. Mould Design We need to spend 3-5 days on mould and product 3D/2D drawing design
5. Mould We will build the mould based on customers' requirements. Before making the mould, we'll send mould design to get customers' approval first. Mould will be usually completed in 25-60 days
6. Mould Testing When moulds are finished, we will test the moulds to check if they will satisfy consumers' needs. And we will send samples for consumers' reference.
7. Sample shoot If the first sample come out is not satisfied by customers, we will modify the mould until it can meet customers' needs.
8. Delivery We'll delivery goods either by sea or by air, according to customers' requirements.
FAQ
Q: what is your trade term?
A: normally FOBNINGBO, if customer country requires, also can accept L/C at sight.
Q: what is your payment term?
A: 30% down payment against order confirmation, 70% balance payment prior shipment.
Q: Have blow machine 100% assemnled well in stock?
A: NO.All blow machine will be assembly produced according to your order.
Q:what is your delivery time?
A: usually in 10-45days, depends on your projects.
Q: what about installing in customer factory?
A: after machine arrive your factory, please prepare water, electric,air and perform, then we will arrange engineer to install machine and train your workers, the longest time to free installing shall be in one week, you should afford engineer air tickets, food, hotel,transport.
Q: what is your packing?
A: wooden pallet packing.
Q:guarantee time?
A: one year guarantee, not man-made.
Showroom
IF YOU WANT TO KNOW MORE INFO ,PLEASE CONTACT ME.
York Kwok
Taizhou Jingtu Plastic Mould Co.,Ltd
M:008613216900876
A:West Industry Zone,Huangyan Taizhou ,Zhejiang,China